Please use this identifier to cite or link to this item:
https://hdl.handle.net/10316/20142
Title: | Procedimento Para Manutenção Preventiva na Empresa de Resíduos Sólidos Urbanos do Centro "ERSUC" | Authors: | Nancabú, Paulino | Orientador: | Afonso, José Luís Ferreira | Keywords: | Manutenção Preventiva; ERSUC; Manutenção; Custos; Maintenance; Preventive Maintenance; Costs; Gestão | Issue Date: | Sep-2011 | Citation: | NANCABÚ, Paulino - Procedimento Para Manutenção Preventiva na Empresa de Resíduos Sólidos Urbanos do Centro "ERSUC". Coimbra: [s.n.], 2011. Dissertação de Mestrado | metadata.degois.publication.title: | Procedimento para Manutenção Preventiva na Empresa de Resíduos Sólidos Urbanos do Centro "ERSUC" | metadata.degois.publication.location: | Coimbra | Abstract: | O presente trabalho, tem como finalidade o desenvolvimento de um procedimento para
manutenção preventiva programada na Empresa de Resíduos Urbanos do Centro (ERSUC). O procedimento tem como finalidade alargar a vida útil dos veículos que
fazem trabalho de recolha indiferenciada de resíduos nas regiões afectas à empresa,
permitindo assim obter uma redução de custos no que diz respeito a reparações e evitar
ter os veículos imobilizados.
O trabalho conta com quatro capítulos, nos quais são apresentados conceitos gerais sobre os vários tipo de manutenção e um aprofundamento sobre manutenção preventiva, que é o tema do nosso caso de estudo, bem como o diagnóstico da empresa e a situação nela existente, em termos de manutenção preventiva. No último capítulo foi realizado o desenho e implementação de um procedimento de manutenção preventiva programada.
Foi nosso objectivo realizar um trabalho que fosse útil para a Empresa. This work aims to develop a procedure for scheduled preventive maintenance in the Empresa de Resíduos Urbanos do Centro (ERSUC). The procedure aims to extend the lifetime of the vehicles that perform undifferentiated waste collection in the regions assigned to the company, thereby achieving cost savings concerning repairs and avoiding vehicle immobilization. The work is composed of four chapters, presenting general concepts of the various types of maintenance and, as it is the subject of our case study, a deepened study on preventive maintenance. It also presents a diagnosis of the company and the company's existing situation in terms of preventive maintenance. The design and implementation of a scheduled preventive maintenance procedure was carried out in the last chapter. I hope that this project can be useful to the company. |
Description: | Dissertação de Mestrado em Engenharia e Gestão Industrial apresentada à Faculdade de Ciências e Tecnologia da Universidade de Coimbra | URI: | https://hdl.handle.net/10316/20142 | Rights: | openAccess |
Appears in Collections: | UC - Dissertações de Mestrado FCTUC Eng.Mecânica - Teses de Mestrado |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Dissertação, Paulino Nancabú.pdf | 752.2 kB | Adobe PDF | View/Open |
Page view(s) 20
753
checked on Oct 29, 2024
Download(s) 1
15,879
checked on Oct 29, 2024
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.