Title: | Análise da viabilidade da adição da reversibilidade a pequenos aproveitamentos hidroeléctricos pré-existentes | Authors: | Teles, Carlos Manuel Escorcio | Orientador: | Almeida, José Paulo Pereira de Gouveia Lopes de Marques, José Alfeu Almeida de Sá |
Keywords: | Aproveitamentos hidroeléctricos | Issue Date: | 27-Mar-2015 | metadata.degois.publication.location: | Coimbra | Abstract: | A produção e o consumo de energia a nível mundial não param de crescer, induzindo um
aumento das preocupações ambientais. Os protocolos internacionais com vista a obrigar os
países à redução das emissões de CO2 têm levado ao aumento do peso das energias renováveis
na produção de energia.
Em Portugal essa tendência também se tem verificado, em especial no grande aumento da
potência eólica instalada, que embora ambientalmente vantajosa, não permite responder aos
picos do diagrama de consumo diário.
Mundialmente assiste-se a uma crescente tentativa em aproveitar a energia produzida pelas
eólicas durante os períodos de menor consumo. Sendo o armazenamento na forma de energia
potencial gravítica da água, a única forma economicamente viável de armazenar energia em
grande escala, tem-se recorrido à construção de barragens com albufeira, equipadas com grupos
turbogeradores reversíveis, que podem bombear a água temporariamente retida no
contraembalse construído imediatamente a jusante. Quando a hidrografia e a orografia não
proporciona este tipo de solução, tem-se optado pela criação de sistemas constituídos por
reservatórios artificiais, de montante e de jusante, operando em circuito hidráulico fechado
munidos de grupos turbogeradores reversíveis, no qual a água nunca é consumida, limitandose
a circular alternadamente de montante para jusante e vice-versa.
Na União Europeia, Portugal lidera essa tendência com a construção de novas barragens
reversíveis e a modernização das existentes, em grande parte devido à necessidade de
regularizar o extraordinário aumento de energia eólica instalada nos últimos anos.
Se relativamente às grandes hídricas as vantagens da reversibilidade são já amplamente
reconhecidas, o mesmo não se passa em relação à adição desta valência a pequenos
aproveitamentos hidroelétricos (PAH) pré-existentes.
Neste âmbito, a presente dissertação pretende dar um contributo para o estudo da viabilidade
da adição de reversibilidade em PAH, já construídos, considerando o caso particular da
barragem do Catapereiro, localizada na Ribeira da Teja, em Vila Nova de Foz Côa. The energy production and consumption worldwide continues to grow, increasing the environmental concerns. The international protocols in order to compel the countries to reduce CO2 emissions have led to the increase of the renewable energy production. In Portugal, that tendency has also been verified, especially with the big increase of the wind power capacity. Despite its environmental advantages, wind power does not allows to respond to the daily consumption demands. To overcome this problem there is an increasing attempt to store the wind energy produced during the periods of lesser consumption. Storage, in the form of water gravitational potential energy, is the only economically viable way of storing large amounts of electrical energy, using pumped-storage power plants, equipped with pump-turbine groups, which can pump the water from downstream dam reservoir to the upstream dam reservoir during low consumption periods. During peak consumption periods, the water from the upstream dam reservoir goes to the turbines to produce electric energy. When the hydrography and orography does not enables this kind of solution, a system composed by two artificial reservoirs (upstream and downstream) can be adopted. In this case a closed hydraulic circuit, equipped with pump-turbine groups, connects the two reservoirs. Water can flow from upstream reservoir to the downstream reservoir or in a reverse way, never being consumed. In the European Union, Portugal leads this trend with the construction of new pumped-storage power plants and the modernization of existent ones, due to the need to regularize the boom of wind power capacity installed in the last years. Pump-storage advantages in large hydropower projects are now widely well-known. However studies most be developed for pump-storage addition to existing small hydropower plants. In this thesis we will try to contribute to the analysis of the technical and economical feasibility of adding pump-storage to existing small hydropower plants. We will present a case study based on the Catapereiro small hydropower plant located in Ribeira da Teja, in Vila Nova de Foz Côa. |
Description: | Dissertação de Mestrado Integrado em Engenharia Civil apresentada à Faculdade de Ciências e Tecnologia da Universidade de Coimbra. | URI: | https://hdl.handle.net/10316/38653 | Rights: | openAccess |
Appears in Collections: | UC - Dissertações de Mestrado FCTUC Eng.Civil - Teses de Mestrado |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Analise da viabilidade da adicao da reversibilidade a pequenos aproveitamentos hidroelectricos pre existentes.pdf | 9 MB | Adobe PDF | View/Open |
Page view(s) 50
541
checked on Nov 6, 2024
Download(s) 10
2,071
checked on Nov 6, 2024
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.