Utilize este identificador para referenciar este registo:
https://hdl.handle.net/10316/45581
Título: | A stochastic model and algorithms for determining efficient time–cost tradeoffs for a project activity | Autor: | Godinho, Pedro Costa, João Paulo |
Palavras-chave: | Stochastic modeling; Activity management; Multicriteria analysis; Time cost tradeoff | Data: | 30-Mai-2017 | Editora: | Springer Verlag | Título da revista, periódico, livro ou evento: | Operational Research | Resumo: | We consider a stochastic model for the time-cost tradeoffs of an activity. In this model the activity can be undertaken by using several different resources, and the resource in use may change according to the way the activity is evolving. We present two algorithms for identifying strategies that are in a predefined neighborhood of the efficient set: one of them is based on a tree structure and the other is based on dynamic programming. Both algorithms take advantage of some mathematical properties of the model in order to reduce their running time and memory requirements. We present the results of some computational tests, as well as an application example. We conclude that the dynamic programming algorithm performs quite well, although it is sometimes necessary to adjust the parameters related to the neighborhood of the efficient set to be able to have reasonable running times. | URI: | https://hdl.handle.net/10316/45581 | ISSN: | 1109-2858 | DOI: | 10.1007/s12351-017-0326-5 | Direitos: | embargoedAccess |
Aparece nas coleções: | I&D CeBER - Artigos em Revistas Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
ORIJ final.pdf | 1.05 MB | Adobe PDF | Ver/Abrir |
Citações SCOPUSTM
2
Visto em 9/nov/2022
Citações WEB OF SCIENCETM
20
2
Visto em 2/jun/2024
Visualizações de página 10
905
Visto em 1/out/2024
Downloads
302
Visto em 1/out/2024
Google ScholarTM
Verificar
Altmetric
Altmetric
Este registo está protegido por Licença Creative Commons